Yantai Shenglida Engineering Technology Co., LTD
 
 
   
  Products
Truck Mixer
Slag Conveyor
 
 
   
 
Auxiliary Materials Current position:Home > Auxiliary Materials > Low melting point CaO
 
Introduction of low melting point CaO compound desulfurizer
1. Instruction:
The product is a new-generation desulfurizer developed by our company, mainly aiming the CaC2 and CaO desulfurizer whose melting point is over 1700℃, absorptivity is low, reaction time is too long, and the molten iron cools seriously. The product is made artificially, with the melting point 1400-1500℃. The features are: The adding volume is 0.5-1.5%; the cost reduces 30-50% compared with CaC2 desulfurizer. Molten steel desulfuration and molten iron desulfuration both can be used. Absorb quickly and react swiftly. Injection process can reach a satisfied effect. The CaO passivated does not absorb moisture and dissolve in water, and is easy to transport and store.

2. Specification and model

Model

Specification

Main ingredients %

Application scope

CaO

CaC2

CaF2

DTS-1

<2mm

50-70

-

5-10

Apply to the desulfuration of large and medium iron ladle injection process

DTS-2

<2mm

40-60

20-30

5-10

Apply to the desulfuration of cupola iron ladle injection and mixing process

DTS-3

<2mm

30-50

40-50

5-10

Apply to the desulfuration of below 3t iron ladle injection process, and also the deep desulfuration of the mixing process.

Note: It can be processed according to the customers’ requirements.

3. Usage:
DTS-1 is mainly used for the desulfuration of molten steel, molten iron, and above 3t iron ladle injection process; the temperature of the molten iron (steel) is over 1400℃, the adding volume is 0.5-1.5%, and the desulfuration rate can reach 30-50%. DTS-2 and DTS-3 are mainly used for the desulfuration of below 3t iron ladle injection process; the temperature of the molten iron is over 1400℃, the adding volume is 0.5-1.5%, and the desulfuration rate can reach 30-40%. About desulfuration of the mixing process, the reaction time of desulfuration is 3-8min. When the temperature of molten iron is 1450-1500℃, the desulfuration rate can reach 60-90%.

4. Package:
25Kg plastic and paper compound bag, or pack it according to the customers’ requirements.
 
 
 
  About Us | Products | Member Login | Contact Us | Online Message
 
    Yantai Shenglida Engineering Technology Co., LTD.
Designed by www.21-sun.com
Copyright Yantai Shenglida Engineering Co., Ltd. All rights Reserved.